24/7 cover · Nationwide from Oxfordshire

Northern England road climbing across Pennine moorland with dry-stone walls and a stone viaduct

The North · north west & north east

Traffic Management Acrossthe North West andthe North East.

Dense Victorian city cores, motorway corridors over the Pennines and exposed upland routes that punish a badly weighted sign. We design for the road and the weather, then install with our own ticketed crews.

Manchester, Liverpool, Leeds, Sheffield, Newcastle, Yorkshire and Cumbria · M60, M62, M6, A1(M) corridors · 12D crews · 24/7 call-out · £10m public liability.

25

Years in traffic management

~300

Operatives & staff

~150

Lorries, vans & cars

£10m

Public liability cover

24/7

Cover, including call-outs

Local coverage

Coverage from the North West across the Pennines to the North East

Coverage
Greater Manchester, Merseyside, Cheshire, Lancashire, Yorkshire, Teesside, Durham, Tyne and Wear, Northumberland and Cumbria
Availability
24/7, including night working and emergency rapid-response call-outs
Authorities
Combined authority, city, unitary and county highway authorities, plus National Highways on the motorway and trunk network
Site types
Victorian terraced streets, city centre regeneration, motorway and trans-Pennine corridors, dock and industrial estates, upland rural routes

Our northern coverage spans Greater Manchester, Merseyside, Cheshire and Lancashire in the west, West and South Yorkshire including Leeds, Bradford, Sheffield and York, and the North East through Teesside, Durham, Newcastle, Sunderland and Northumberland, along with Cumbria and the upland routes between.

The road network is a mix of intensive urban systems — the Manchester and Leeds inner networks, Liverpool's dock and city roads, Sheffield's valley layout — and long strategic corridors including the M6, M60, M62, M56, M1, A1(M), A19, A66 and A628 over the Pennines.

The northern cities have a large stock of Victorian terraced housing and older industrial and commercial buildings, which means narrow adopted streets, on-street parking on both sides, tight turning heads and utility apparatus that predates modern street layouts. Working space is frequently the binding constraint before traffic volume is.

The work includes utility and civils programmes across the conurbations, city centre regeneration and construction access, motorway and trans-Pennine corridor schemes, long-duration development accesses, rail and infrastructure project support, and rural and upland works in Cumbria, the Dales, the Peak fringe and Northumberland.

Services in the North

Everything the scheme needs,available across the North

Everything a northern scheme needs — including the stop-go and convoy capability for upland roads and the 12D crews for the corridors.

Why us here

Why contractors in the Northkeep the work with us

One contractor across both halves
North West and North East programmes stay on one contract with one point of contact, rather than being split between regional firms.
Designed for narrow terraced streets
Arrangements that work where the carriageway is already half-consumed by parked cars — the defining condition in much of the northern housing stock.
Corridor and trans-Pennine capability
Sector Scheme 12D crews for the M6, M60, M62, M1 and A1(M), and stop-go or convoy where an upland route cannot be closed.
Weather-resilient installations
Signage weighted, sited and inspected for wind, rain and winter conditions on exposed routes, because a displaced sign is a scheme that no longer works.
25 years and our own crews
A quarter of a century of temporary traffic management, delivered by operatives holding Lantra and NRSWA cards with T1, T2 and T3 tickets.
Accredited and insured
Constructionline, CHAS, SafeContractor, Achilles UVDB, Acclaim, BM Trada and ISO 9001, with £10m public and £10m employers' liability.

Local conditions

What northern conditions do to a scheme

Two distinct problems dominate here: streets that are physically too small for the works, and exposed routes where the weather dismantles a weak installation.

Victorian terraced streets and parking

Large parts of Manchester, Liverpool, Leeds, Bradford, Sheffield and the North East consist of terraced streets with no off-street parking, so both kerbs are lined with cars before you arrive.

The workable arrangement usually depends on parking suspensions and door-to-door notification being in place beforehand — without them the working space is occupied on the morning of the works and nothing can be installed.

Building age and buried services

Older housing and industrial stock sits above utility apparatus of similar age, with incomplete records. Excavations regularly reveal unexpected services and expand beyond the planned footprint.

When the footprint changes, the traffic arrangement must change under permit conditions, which is far faster when the contractor who designed and submitted the scheme is already on site.

Weather, wind and winter

Exposed upland and coastal routes across the Pennines, Cumbria and Northumberland take strong wind and driving rain that move cones and signage, and winter brings ice, snow and very early darkness.

Signage has to be weighted and sited for that, kept clean and reflective, and inspected — including out of hours, because a scheme that has blown out of position overnight is a hazard by morning.

Trans-Pennine and upland routes

Routes such as the A628, A66 and A57 have long distances between junctions, gradients, and few or no alternatives, so closure means a diversion of many miles and stop-go or convoy is often preferred.

Shuttle lengths, sight lines on bends and gradients, and communication between operatives at each end all have to be set conservatively on these roads.

Dense city networks and regeneration

Manchester and Leeds in particular run intensive inner networks with bus corridors, tram and rail interfaces, cycle provision and continuous regeneration works competing for the same road space.

Coordination matters as much as design here: several promoters working in the same area is how conflicting arrangements and refused permits happen.

Industrial estates, docks and HGV movements

Merseyside's dock estate, Teesside's industrial areas and the region's distribution parks generate heavy, constant HGV movements, including abnormal loads.

Access geometry, swept paths and holding areas decide whether an arrangement survives contact with those vehicles, and marshalling is often needed rather than signage alone.

Our process

How a the North scheme gets fromenquiry to signed-off completion

  1. Step 1

    Enquiry and site review

    You send the location, the works and the dates. We check the road type, the speed limit, the highway authority involved and any local constraints before quoting.

  2. Step 2

    Scheme design and CAD drawing

    We produce the temporary traffic management design and scheme-specific CAD drawings for the arrangement your works actually need, not a generic layout.

  3. Step 3

    Permits, TTROs and authority approval

    We submit to the local highway authority and manage the process end to end — permits, Temporary Traffic Regulation Orders, notices and conditions — and confirm approval in writing.

  4. Step 4

    Programming and resourcing

    Crews, signals, signage and barriers are allocated from our fleet of around 150 vehicles and team of around 300, and booked to the dates you have been given.

  5. Step 5

    Installation by our own crews

    Carded and ticketed operatives working under our supervision install to the approved drawing, with the arrangement checked against the drawing before works start.

  6. Step 6

    Maintenance, phase changes and collection

    The scheme is inspected and maintained, damage and displacement dealt with including out of hours, phases changed as planned operations, and everything collected at completion.

Standards we work to in the North

  • Sector Scheme 12 — 12A, 12B, 12C & 12D
  • Chapter 8 (Traffic Signs Manual)
  • New Roads & Street Works Act (NRSWA)
  • Lantra/NRSWA cards, T1/T2/T3 tickets
  • £10m public liability & £10m employers' liability insurance

Accreditations held

  • National Highway Sector Schemes
  • Constructionline Gold
  • BM Trada
  • CHAS
  • Acclaim
  • Achilles UVDB
  • Avetta
  • Builder's Profile
  • SafeContractor
  • ISO 9001

Certificates are issued for your pre-qualification pack on request. We work direct for end clients and as a subcontractor to principal contractors.

Straight answers

Traffic management in the Northquestions we are asked

Do you cover the North of England?

Yes — the North West including Greater Manchester, Merseyside, Cheshire and Lancashire, Yorkshire including Leeds, Bradford, Sheffield and York, the North East including Teesside, Durham, Newcastle, Sunderland and Northumberland, plus Cumbria.

How fast can you reach a site in the North?

The North is a planned coverage area resourced from around 300 operatives and around 150 vehicles, with crews and equipment allocated to your dates. Emergency rapid-response call-out cover runs 24 hours a day, seven days a week.

How much does traffic management cost in the North?

Pricing depends on the road type and speed limit, the arrangement required, the equipment on hire, the duration, the number of operatives and the working hours permitted, plus authority permit or TTRO fees. A terraced-street scheme with signals prices very differently from a motorway lane closure, so we quote each one in writing.

Is emergency traffic management available in the North?

Yes, 24/7. That covers burst mains, carriageway failures, collisions, storm damage and damaged temporary traffic management on both urban and high-speed roads.

Can you work in narrow terraced streets with parked cars?

Yes, and the key is preparation: parking suspensions and resident notification arranged in advance so the working space is clear, then an arrangement designed for the actual width available rather than a standard layout.

Can you work on the M6, M62, M60 and A1(M)?

Yes, under Sector Scheme 12D registration with ticketed crews, in windows agreed with National Highways, with correct taper lengths, safety zones and advance signing.

How do you handle upland and trans-Pennine routes?

Usually with stop-go or convoy working rather than closure, because diversions can run for many miles. Shuttle lengths and sight lines are set conservatively for gradients and bends, and signage is weighted for exposure.

Do you work nights in northern cities?

Yes. City centre and corridor works are frequently restricted to nights, and those schemes are planned as night shifts with lighting, conspicuity and enough operatives to install and remove within the window.

Do you handle the permits and TTROs?

Yes, end to end with each relevant authority — permit applications, Temporary Traffic Regulation Orders, notices and conditions — with approval confirmed in writing before you mobilise.

What accreditations and insurance do you hold?

Sector Scheme 12 registration across 12A to 12D, Chapter 8 and NRSWA compliance, Constructionline, BM Trada, CHAS, Acclaim, Achilles UVDB, SafeContractor and ISO 9001, with £10 million public liability and £10 million employers' liability.

Nearby areas we also cover

  • Traffic management in the Midlands

    Traffic management across the East and West Midlands: Birmingham, Coventry, Leicester, Nottingham, Derby, Northampton. Closures, signals, permits, TTROs, night works, 24/7 cover.

  • Traffic management in Scotland

    Traffic management across Scotland: Glasgow, Edinburgh, Central Belt, Aberdeen, Dundee, Perth and the Highlands. Closures, convoy and stop-go, signals, permits, 24/7 cover, £10m insurance.

  • Traffic management in Wales

    Traffic management across North and South Wales: Cardiff, Newport, Swansea, Wrexham and rural routes. Closures, convoy and stop-go, signals, permits and TTROs. 24/7 cover, £10m insurance.

  • Traffic management in Oxfordshire

    Temporary traffic management in Oxfordshire from our county base: road and lane closures, traffic light hire, permits and TTROs with Oxfordshire County Council. 25 years, 24/7 cover, £10m insurance.

Keep going

See every service area, browse all traffic management services, read about the company, return to the homepage or contact the team.

Terraced streetor trans-Pennine route.Send us the site.

Give us the location, the works and the dates. You get a written estimate covering the design, the suspensions, the authority permit or TTRO, the equipment and the crews.

25 years · Sector Scheme 12A–12D · £10m public liability · 24/7 cover

Send the details

Road type, duration and start date is enough to price it. We reply to every enquiry.